Passivhaus Certified Practice

Buildings that
breathe in silence,
barely need heat.

Walls thick as vaults. Triple-glazed apertures angled to every winter photon. Ventilation systems that recover 92% of exhaust heat. We design the invisible systems that make beautiful buildings need almost nothing to stay warm.

≤15kWh/m²/yr

Heating demand

0.6ACH₅₀

Airtightness

92%efficiency

Heat recovery

Foundation
Insulation
Membrane
MVHR
Glazing
Solar
300mmEPSAirtightness membraneMVHRSupplyExtractTripleLow-eWinter sun21°Cmaintained all winterU=0.10W/m²K
Scroll to learn
Passivhaus Certified
≤15 kWh/m²/yr Heating Demand
Triple Glazed Low-e Windows
MVHR 92% Heat Recovery
Continuous Airtightness Membrane
Thermal Bridge Free Detailing
PHPP Energy Modelling
PHI & BRE Certified Components
U-values ≤ 0.10 W/m²K
Passivhaus Certified
≤15 kWh/m²/yr Heating Demand
Triple Glazed Low-e Windows
MVHR 92% Heat Recovery
Continuous Airtightness Membrane
Thermal Bridge Free Detailing
PHPP Energy Modelling
PHI & BRE Certified Components
U-values ≤ 0.10 W/m²K
01 / Physics

The heat balance
made visible.

Every Passivhaus is a precision energy equation. Hover each node to understand how gains and losses are calibrated to eliminate the need for conventional heating.

PHPP Heat Balance
+3.2Solar Gains+2.1Internal Gains−4.8Transmission Loss−1.8Ventilation Loss≤15Heat Balance
U-Value Comparison
Standard UK wall0.35 W/m²K
Part L compliant0.18 W/m²K
Passivhaus wall0.1 W/m²K
Passiv detail0.08 W/m²K

Our standard wall detail achieves U=0.08 W/m²K — over 4× better than current UK regulations. Every watt saved at the envelope is a watt never needed from a boiler.

Thermal Bridge Analysis
Conventionalψ = 0.12 W/mKPassiv detailψ = 0.00 W/mK

Thermal bridges at junctions can account for 30% of total heat loss in conventional construction. Our details eliminate them entirely — every junction modelled in THERM.

02 / Case Study

Alderton House —
certified EnerPHit retrofit.

A 1960s semi-detached in Oxfordshire. Heating demand reduced from 143 kWh/m²/yr to 12 kWh/m²/yr. The owners felt the difference before the first winter bill arrived.

Alderton House exterior construction showing external insulation being applied to 1960s semi-detached
PHPP Results
Heating demand
143→12kWh/m²/yr
Primary energy
310→89kWh/m²/yr
Airtightness
8.2→0.6ACH₅₀
Window Jamb Detail
MasonryInsulationInterior
Uf = 0.73 W/m²KNo thermal bridge
91%

Heating demand reduction

£380

Annual energy bill (down from £2,100)

14mo

Construction programme

EnerPHit

PHI certified retrofit standard

Interior of a Passivhaus living space with timber floors, large south-facing windows, and warm afternoon light
03 / Clients

They felt it
before the first bill.

"We'd obsessed over the PHPP spreadsheet for two years before finding Passiv. They looked at our numbers, corrected three modelling errors, and told us we could go thicker on the north wall for £4,000 more. The heating demand dropped by another 3 kWh/m²/yr. Worth every penny."

"Planning approval came through with a Passivhaus condition attached — the committee wanted proof it was achievable. Passiv produced a pre-application energy statement that silenced every objection. We exchanged contracts three weeks later."

"I moved in October and didn't turn the heating on until January — and even then only for two hours. The house just… stays warm. The MVHR means it smells fresh even with the windows closed all winter. I didn't know buildings could feel like this."

James Whitfield, self-builder, smiling man in his forties with grey temples outdoors

James Whitfield

Self-builder, Gloucestershire

New build · Passivhaus Classic

PHI Certified Designers

Passivhaus Institut, Darmstadt

04 / Resources

Start with the
Passivhaus Starter Pack.

A bundled PDF of U-value calculators, certified component suppliers, and a pre-consultation checklist — everything you need before your first site meeting.

What's in the pack

⬡

U-Value Calculator

Pre-configured spreadsheet for walls, roof, floor, and glazing. Enter your construction and get instant PHPP-ready outputs.

◈

Certified Component Directory

47 PHI-certified insulation products, window systems, and MVHR units — all with UK suppliers and current pricing.

◻

Pre-Consultation Checklist

23 questions to answer before your first meeting. Clients who arrive prepared reduce design fees by an average of 18%.

40-min video · Free

Thermal Bridge Masterclass

How thermal bridges form at junctions, how to model them in THERM, and the five details that eliminate them in every project type. Gated — enter your email above to unlock.

Download the Starter Pack

No spam. One email with your pack, unsubscribe any time.

Also unlocks the Thermal Bridge Masterclass — 40 minutes, no upsell.

PHI Certified
RIBA Chartered
BRE Certified